VOCUS CABLE IN PERTH CUT by Maersk vessel, $1.5m repair cost
Aug 2021: The Australia Singapore Cable (ASC) was cut on 1 August 2021, The cut was 10km offshore from Perth City Beach inside the Perth Submarine Cable Protection Zone.
Arnnet.com.au reported:
Police claim the ship had been anchored approximately 500 metres from the protection zone, and allegedly dragged its anchor through the area in high winds, snagging and damaging the 20-metre-deep cable.
The master of the cargo ship Maersk Surabaya was arrested and charged.
Aside from the repair cost, the cable break impacted services into and out of Perth.